Sarasota National Cemetery - Sarasota, FL

JBI Contractors played a crucial role in the expansion of the Sarasota National Cemetery while working under C&C Contractors. JBI’s primary responsibility was excavating large ponds on site to generate the fill dirt necessary to bring the existing site to grade. By utilizing large excavators and off-road dump trucks, JBI was able to move thousands of cubic yards of dirt daily, ensuring the project remained on schedule.

​

In addition to bulk earthmoving, the project required the installation of over a thousand feet of reinforced concrete pipe, as well as multiple precast inlets and mitered end sections for the onsite storm drainage system. Once the storm drainage and bulk earthmoving were completed, JBI carried out remaining finish grade and road work needed to complete the site. 

453101762_8449873201710105_5818089347718755973_n.jpg
476180066_1105841938009197_642116643452400253_n.jpg

City of New Smyrna Parking - New Smyrna, FL

The City of New Smyrna Beach needed additional parking spaces for its employees. To address this need, JBI Contractors, working on behalf of the City, constructed a stabilized shell parking lot adjacent to their building. Shell parking lots are a cost-effective solution, providing a durable and stabilized surface for accommodating additional vehicles or offering access to specific locations. The project also consisted of storm drainage, landscaping and irrigation, handicap parking stalls, and concrete wheel stops and signage.  

City of Deland Fire Station - Deland, FL

 Partnering with the City of Deland, JBI Contractors successfully completed multiple scopes of work. The project began with the demolition of existing structures to make way for the new facility. JBI Contractors then undertook a variety of critical improvements, including utility upgrades, storm drainage enhancements, and the expansion and restoration of the parking lot. This work included the installation of concrete sidewalks, curbing, asphalt pavement, as well as striping and signage. To complete the project, landscaping and irrigation systems were added, ensuring a beautiful and functional new fire parking lot for the City of Deland.

DJI_0209.JPG
IMG_4674.jpeg

Veterans Memorial Park - Daytona Beach, FL

 The Civil Site Work at Veterans Memorial Park involves the comprehensive development and improvement of key infrastructure elements within the park. The project aims to enhance accessibility, aesthetics, and functionality while preserving the park's role as a space of honor and reflection for veterans. Necessary upgrades to electrical, water, and sewer lines to support new infrastructure, landscaping, and future park amenities. The work will include grading, drainage, landscaping, pedestrian pathways, and other civil improvements that promote a safe and welcoming environment for visitors. Necessary upgrades to electrical, water, and sewer lines to support new infrastructure, landscaping, and future park amenities.

Fort Wall Restoration - New Smyrna, FL

 New Smyrna Beach's Old Fort Park required restoration to preserve this historical site and protect it from further settling/damage. JBI Contractors worked alongside MGN Contracting LLC on this project to help ensure the Fort remains intact for many years to come. JBI carefully excavated the existing Fort walls to provide necessary reinforcement, preventing further deterioration of the ruins within the Fort. We also installed an extensive under-drain system to ensure that the water behind the wall would no longer create pressure against it.

​

This project highlights JBI’s ability to work around delicate, fragile conditions, requiring highly skilled operators to ensure no additional damage was done to the site during the restoration process.

DJI_0174.JPG
2025-02-18 10.38.54.jpg

Hawks Park Pickleball Courts - Edgewater, FL

The Hawks Park Pickleball Courts project is a comprehensive civil development that includes the excavation of a dry pond for stormwater management, installation of concrete storm drain pipe, precast inlets, Nyloplast yard drains, and ADS piping to ensure efficient site drainage. The project also includes the installation of water and sanitary service lines to accommodate a future bathroom facility. Site improvements feature concrete curbs and sidewalks for accessibility, along with the construction of an asphalt parking lot complete with striping and signage. Central to the project is the development of multiple pickleball courts, finished with appropriate surfacing, fencing, and amenities to support recreational use. This project enhances community infrastructure while supporting future growth and recreational opportunities at Hawks Park.

305 Base Leg Drive - Edgewater, FL

JBI Contractors worked with a private developer in Edgewater, FL, to create commercial warehouse space for future tenants on Base Leg Drive. The project began with land clearing to prepare the lot for construction. Imported fill material was delivered and placed in compacted lifts to establish a stable building pad for the warehouses. JBI Contractors also made connections to existing utilities, ensuring the site had potable water and a functional sanitary sewer system. In addition, the team installed storm drainage systems, graded the area with crushed concrete road base, and completed the project with the installation of concrete curb and gutter, followed by asphalt paving.

IMG_4829.jpeg
IMG_6813.jpeg

Marine Science Center - Ponce Inlet, FL

The Volusia County Marine Science  Center needed significant upgrades to its facilities, and JBI Contractors stepped in to provide vital assistance. Using specialized dewatering methods designed for coastal environments, JBI efficiently installed a range of underground utilities, including directional drilling, fusing, gate valves, and open-cut utility installation. The project also involved enhancing storm drainage, creating a stabilized subgrade parking lot, and laying down a crushed concrete road base. In addition, upgrades included concrete sidewalks, curbs, gutters,  asphalt paving, and the installation of new signage and pavement markings. JBI  Contractors' deep expertise in working with coastal areas and challenging high groundwater conditions played a key role in the project's success.  

Miller's Ale House – Apopka, FL

The Miller's Ale House project in Apopka, FL, was a comprehensive civil site development initiative. The scope of work included land clearing, demolition, and extensive site grading to prepare the area for development. Underground utilities were installed to ensure proper infrastructure, while storm drainage systems were designed to manage water runoff effectively. Additionally, the project involved the construction of a parking lot to accommodate the needs of the establishment. This project required careful planning and execution to ensure all aspects, from utility installation to drainage, were seamlessly integrated for a successful build.

IMG_4478.jpeg
IMG_6806.jpeg

Boggs Ford Road - Port Orange, FL

   JBI Contractors successfully completed drainage improvements on Boggs Ford Road for the City of Port Orange. Throughout the project, JBI maintained a safe and efficient Maintenance of Traffic (MOT) plan to ensure the safety of both pedestrians and vehicles traveling through the work area. The project addressed deficiencies in the existing storm drainage system, which had been unable to handle sufficient water volume, resulting in flooding that affected both the roadways and nearby residential areas. To resolve this, JBI  relocated existing 8” water main supplying the entire neighborhood and installed storm pipe and precast structures, significantly enhancing the storm drainage capacity and helping to preserve the integrity of the city’s infrastructure.